Average Installation Time
Cabinet Levelers Review
The EZ-Level System installed a lot quicker than we anticipated. That's because they provide a small metal template so that drilling the access holes in the toe kicks only took about 4 minutes.

It should be noted that this was the only system that actually came with instructions, so we did not take into consideration the time to read them. (read time: about 8 minutes)

The install only took 15 minutes start to finish! VERY FAST!
Our # 2 &  #3  pick mounts up quick enough, but measuring and drilling for the access holes inside the cabinet was a REAL PAIN ! Also we had to drill pilot holes from the bottom side and then the larger holes from the topside to avoid "blowout". 

The levelers must be perfectly aligned with the access holes our you will not be able to get the adjusting wrench onto the levelers!

This install took about 1 hour to complete.
No. 4 mounts up very quick. Although we had to install (4) levelers on every single cabinet (see Load capacity), therefore it took a bit longer than the No. 1 choice.


#1
#5
#2
#6
#4
#3
#7
Editors Pick
2011
30 Min
1 Hour
15 Minutes
1 Hour
20 Minutes
1 Hour
N/A
No. 5 mounts up very quick as well. Although we had to install (4) levelers on every single cabinet (see Load capacity), therefore it took a bit longer than the No. 1 choice.

Drilling for the access holes in the cabinet did cost us a bit more time, but not much.


Our No. 6 pick mounts up quick enough, but measuring and drilling for the access holes inside the cabinet was a REAL PAIN ! Also we had to drill pilot holes from the bottom side and then the larger holes from the topside to avoid "blowout". 

The levelers must be perfectly aligned with the access holes our you will not be able to get the adjusting wrench onto the levelers!

This install took about 1 hour to complete.
Score
Time
.